Welcome to
The Building Department
NOTICE TO
CONTRACTORS
Effective Immediately
The Town of Camp Verde Building Department would like to inform you that beginning immediately all commercial projects will be required to pay plan review fees at the time of permit application submittal. At time of submittal, the plan review fee will be calculated using the applicant’s valuation listed on the application. During the actual plan review, the reviewer will check the applicant’s valuation against our adopted fee schedule from the Building and Safety Journal using the appropriate formulas. The customer will pay the difference when the permit is picked up.
Please be informed that this is not an increase of the fees currently being charged for permits but rather a procedural change. In lieu of collecting these fees in the final stage of the permit process they will be collected at the beginning.
Rick Feldmann
Building Official
Ext.
117/rfeldmann@cvaz.org
Certifications
1. Building Inspector 5. Combination Inspector
2. Electrical Inspector 6. Plans Examiner
3. Plumbing Inspector 7. Accessibility Inspector
4. Mechanical Inspector 8. Accessibility & Usability Specialist
Robert Foreman
Building Inspector
Ext.
112/rforeman@cvaz.org
Certifications
1. Building
Inspector
2.Residential Building
Inspector
3. Commercial Building
Inspector
Dallas
Taylor
Code Enforcemnt
Ext. 113/dtaylor@cvaz.org
Certifications
1. Residential
Building Inspector
2. Commercial Building Inspector
Valerie House
Administrative
Assistant
Certifications
1. Permit
Technician
Becky Oium
Administrative
Assistant
Ext. 120/boium@cvaz.org
Certifications
1. Permit
Technician
The Town of Camp Verde Building Department is
charged with the processing and issuance of all Building Safety and Zoning
Clearance permits for all property located within the Town Limits. Permits
for building and structures are required in all areas of the Town. The
Building Department can be reached at (928) 567-8514.
If you are building, either a residential structure or a commercial structure,
and you will be disturbing one acre or more you are required by the Arizona
Department of Environmental Quality to submit a
Notice of Intent (NOI). Click here
for additional information.
The Town of Camp Verde currently uses the following building codes.
The Applicant assumes all responsibility for complying with any deed restrictions (CC&R) that may apply to the property. Construction must be commenced within 180 days of the Issuance of a permit or it becomes void. If construction is abandoned for 180 days the permit becomes void. It is the responsibility of the Applicant to call for inspections on all permits to keep them active.
Applicants must agree to build in accordance with all applicable codes and town ordinances.
Applications become void after 180 days. Deposits are non-refundable.
What is a Building Permit?
A building permit is a license, which grants legal permission to start construction of a building within the incorporated area of the Town of Camp Verde.
What is a Zoning Clearance?
A zoning clearance is required for the placement of Multi-Sectional or Manufactured Homes in the incorporated area of the Town of Camp Verde. A zoning clearance is also needed for perimeter fences and accessory structures of 200 square feet or less.
What Construction Projects Need Building/Zoning Clearance Permits?
Building/Zoning permits are typically required for the following, but this is not a complete list of projects that require permitting:
Permits allow the enforcement of the codes, which have been adopted as law, by the Town. No matter what the specific project may be, the enforcement of codes is for the safety and welfare of the public.
Building permits provide the means for Code Officials to protect us by reducing the potential of unsafe construction and provide the means for Code Officials to inspect construction to see that minimum standards are met and appropriate materials are used to ensure the public safety and welfare.
Commercial Building Policy:
These are the policies the Town of Camp Verde will follow:
A. Wind Shear – Will be based on 90 mile per hour winds. Seismic Zone C and Exposure C
B. Seismic Activity – Zone 1 requires no special conditions
C. Snow Load or Live Load – 20 pounds per square foot. No drift
requirements
D. Dead Load – 10 pounds per square foot.
E. Drainage – 4 inches per hour
F. Frost Depth - 12 inches
The
Community Development
Department is composed of the Building Division and Planning &
Zoning.